Fully Fabricated Pits
| • |
Fabricated Pits are quick to install |
| • |
No costly formwork by the builder |
| • |
Minimal down time to your existing pit activities |
| • |
The fabricated pit is craned into position and concrete poured around it |
|
|
Workshop Pit Fit-Outs
| • |
Lighting class 1 zone 2 |
| • |
Ventilation |
| • |
Lubrication - Engine Oil, Differential Oil, Hydraulic Oil, Coolant Oil, Greases etc. |
|