For this project, Hartex needed to supply 30 meter length fully fabricated service bays.
With innovative design techniques Hartex was able to design a 30m long fully fabricated steel pit with a roll over capacity of 120T to cater for special road train bulk carrier fleets.
The ventilation systems in the pits comply with the Australian Safety Standard: it is adapted to the characteristics of the excavation to offer safe working conditions.
Centralised oil management system to reduce waste and keep the workshop tidy.
Load testing the Jacking System
Waste Oil Trolley.
A fully automatic touchless washing system was developed for the client so they could specifically wash tanker trucks.
The water saving conditions imposed by severe water restrictions has involved Hartex Engineering developing a washing system that requires little water and maximised the benefits of water filtration and recycling systems.